《铁道学报》2008年第1期更正启事
2024-03-28
来源:独旅网
维普资讯 http://www.cqvip.com 第3期 基于CSIs、FIS、WLC、FC综合造价预测方法的探讨 1O9 预测方法,对于样本数量不大和缺乏类似性项目以及 cycle Costing in Buildings[D].Dundee:Department of Civil Engineering of the University of Dundee,1991. 采用新技术、新工艺、新方法的工程项目的造价估算可 提供理论性和实用性强的估算方法。 参考文献: [7]Malcolm R,Horner W.New Property of Numers:The Mean Value and its Application to Data Simplification[J]. The Papers to the Royal Society,2004. I-1]Nannan Wang.New Approaches To Optimising the Whole Life Performance of Building and Civil Engineering Projects [83 Saket M M.Cost Significance Applied to Estimating and Control of Construction Projects[D].Dundee:Department of Civil Engineering of the University of Dundee,1 986. ED].Dundee:Department of Civil Engineering of the Uni— versity of Dundee,2005. [9]Zakieh R.Quantity—significance and Its Application to Construction Project Modelling[D].Dundee:University of Dundee,1991. E2]The International Cost Engineering Council.The Definition of Cost Engineering[EB/OL].http://www.icec.net, 1997. [103李安贵,张志宏,段凤英.模糊数学及其应用[M].北京:冶 金工业出版社,2000:174—192. E3]Kishk M,A1一Hajj A,Pollock R,Aouad G,Bakis N,Sun M.Who1e Life Costing in Construction:A State of the Art [¨]Ross T J.Fuzzy Logic with Engineering Applications [M].Columbus:McGraw—Hill,Inc.,1995. Review[c]//Research Papers,2003,41(8).London:RICS Foundation. [123余建星,段晓晨,张建龙.基于模糊推理系统的政府投资 项目投资预测方法.[J]统计与决策,2006,(16):42—43. YU Jian—xing,DUAN Xiao—chen,ZHANG Jian—long. [4]段晓晨,余建星,张建龙,基于CS、WLC、BPNN理论预测 铁路工程造价的方法[J],铁道学报,28(6),2006,117— 122. Costing Prediction of Projects Invested by Government Duan Xiao--Chen,Yu Jian—Xing,Zhang Jian—Long.A Based on FISEJ].Statistics and Decision,2006,(16):42— 43. Method of Estimating WLC of Scheduled Railway Projects Based on CS,WLC and BPNN Theorems[J].Journal of the China Railway Society,2006,28(6):117—122. [133张小平,余建星,段晓晨.政府投资项目的投资估算方法 研究[J].统计与决策,2007,(10):45—47. ZHANG Xiao—ping,YU Jian—xing,DUAN Xiao— [5]Asif M.Simple Generic Models for cost_signIficant Esti— mating of Construction Project Cost[D].Dundee:Depart— ment of Civil Engineering of the University of Dundee, 1988. chen.Method Research of Costing for Projects Invested by Government[J].Statistics and Decision,2007,(10): 45-47. [6]A1-Hajj A.Simple cost_significant Models for Total Life- (责任编辑安鸿逵张武美) .址 《铁道学报》2008年第1期更正启事 《铁道学报》2008年第1期论文”黄土路基工后沉降预测模型对比研究”第45页左栏第5行、第6行中的“(1 一 )”应为“(1+ )”,特此更正。在此特向读者表示歉意。 作者:王丽琴靳宝成杨有海贾文君 编辑出版者:《铁道学报》编辑部