发布网友 发布时间:2022-04-22 06:58
共1个回答
热心网友 时间:2022-06-17 02:14
1998 and documents, works at the Tianjin Tianlong Paper Co., Ltd., engaged in electrical instrumentation maintenance work.
Main ties: the entry of new companies this year to participate in a project to install commissioning work, a lot of learning ring the foreign advanced electrical meters. The electrical, pneumatic and hydraulic equipment, such as a deep understanding. Master at work in a lot of high and low voltage electrical equipment maintenance and repair experience, ring the workshop responsible for the factory boiler (35 tons furnace) and the drainage treatment plant to the electrical instrumentation of the day-to-day maintenance and repair work.
2002 2005, Kim worked for the Tianjin Science and Technology Paper Co., Ltd., posts: electrical technician.
Main ties: responsible for the DCS, QCS system and the electrical instrumentation routine maintenance and repair. 2004, head of the instrument, and participated in the factory on 35 KV substations and low-voltage power distribution room regularly sweeping overhaul of work. In the course of Siemens PLC accepted the Frequency Control and routine maintenance of learning. I have made in 2004 in Tianjin Verification awarded Members of the verification certificate, the same year took part in the Tianjin Health Bureau of radioactivity in the training of staff and obtain radioactive engaged in the work of the certificate.
Since 2005, worked for ITT (Tianjin World's Instrial Co., Ltd.), positions: Maintenance Technician.
Main ties: responsible for the whole factory proction lines. Quality inspection departments and machining equipment and routine maintenance, repair and technological transformation, the formulation of each piece of equipment PM security work plan and analysis table listing locking system, and to conclude ME engineers reported regularly to the operation of the equipment. June 2007 to participate in the Company RMU Pelikon new projects and the entire process, and is responsible for electrical projects Pelikon part of the design, installation and debugging the same year the project successful trial operation. During the study in the use of grinders, milling machines, and other machining equipment. In ITT I participated in the 5 S and TPM full equipment maintenance and management of training and quality certification system of training, to enhance proction efficiency, stability, proct quality, rece costs, and equipment of the highest efficiency in the use of a function to lay a good foundation.
I engaged in electrical work for nine years, automation, instrumentation and high and low voltage electrical equipment, a good foundation, independent of the PLC frequency servo systems, such as human-computer interface for maintenance and PLC programming, with heavy instry, electronics manufacturing, and other electrical equipment The daily maintenance and overhaul and has accumulated rich experience, to understand and simple to use CAD plans to skilled use of commonly used office software. Familiar with the work of foreign enterprises and management methods.
I am a serious and responsible work, be able to unite innovation, and be good at listening to suggestions, firmly believe that the team strength, can be very good in the handling of the various relationships in the hope of your company and the common development and common progress.